The images and content on this website may not be reproduced without formal permission. Requests and enquiries concerning the reproduction of information on this website for any purpose should be directed to the Stakeholder and Communications Team email info@nx2group.com.
June 2023
Ara Tūhono - Pūhoi to Warkworth - Opening Night
Ara Tūhono – Pūhoi to Warkworth - Project Flyover: September 2017 vs June 2023
Barrier placement and line marking
Construction team at the ribbon cutting event
Final sweep
First vehicles on the motorway heading southbound
'He Tohu Maumahara'
More of the 'orange army' at the ribbon cutting ceremony
Northbound to Dome Valley
One of the first northbound
Placement of concrete barriers
Pre-start meeting getting ready to open the motorway
'Reipae'
'Reipae' standing tall at Pukerito roundabout
Removal of covered sections of signs
Spray covering of line marking for opening
The construction team celebrating their road ready for opening
The dream team
The lights are on and we are ready to go
The sign says it all
Traffic heading north on the new motorway
Uplifting cones for opening
Waiting to escort the first cars southbound
What a beautiful night to open a motorway
May 2023
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, May 2023
Arawhiti ki Okahu and Hibiscus Coast Highway returned to bi-directional traffic
Arawhiti ki Okahu spanning the estuary
Arawhiti Pua Ngahere flanked by Kauri
Central North rock cut (human for scale)
Completed shared pathway in the North
Construction of buttress fill in the North
Final checks of the emergency phone system
Fun times on site
Gentle curves
Northern Connection from above with Warkworth in the background
Northern Connection fully paved, line marked and ready for opening
One of the 3 underpasses
Te Honohono ki Tai Road stub near completion
The two most beautiful viaducts in the country
View from the top
Wetland planting completed adjacent to Arawhiti Pua Ngahere
March 2023
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, March 2023
Arawhiti ki Pūhoi – the viaduct over Pūhoi River.
Arawhiti ki Pūhoi at sunset
Arawhiti Pua Ngahere – the viaduct which passes through a Kauri forest
Central North rock cuts lined up
Central North with the projects largest cut and fill
Climb north to the highest point of the project
CN1 from the top
Completed section of the motorway with current SH1 in the background
Completion of accessway
Emergency services ramps at Puhoi
Final asphalt layers leading into Puhoi viaduct
Looking south to Johnstone's Hill Tunnels
New Wyllie Road running adjacent to the new alignment
Northern connection under lights
One of the projects largest tip sites contoured and progressively grassed
Projects largest rock cut
Puhoi intersection and viaduct from above
Puhoi off-ramp
Pukerito roundabout lit up at night
Southern rock cut heading north to Moir Hill bridge
Tapuwae o Kahumatamomoe – the bridge at Moir Hill.
Temporary road layout at Puhoi
Terrestrial mitigation planting between the motorway and east branch of Mahurang
The 11-barrell culvert with Dome Valley in the background
The project's Southern Connection to SH1
The Southern Connection
Thermoplastic line marking and cats eyes in place
Thermoplastic line marking having it's close-up moment
Traffic lights and signage up at the connection to Matakana Link Road
Woodcocks Road Bridge
Wyllie, Carran and Woodcocks Roads intersection
February 2023
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, February 2023
Auckland but a stones throw away
Central North tiger country changed forever
CN1 cut from above with its near vertical slopes
CN1 cut in the foreground, with largest cut CN5 in the distance
Completed line marking with thermoplastic
Erasmo's cut
Final layer of OGPA immediately north of JHT - kiwi ingenuity at it's finest
Mahurangi River bridge above realigned section of the river
Northbound
NZ's largest culvert system balancing water level
Our northern most wetland immediately south of Pukerito roundabout
Projects longest culverts - out of sight beneath NZ's largest roading embankment
Pukerito from above with Dome Valley in the background
Rock lined swale flowing nicely
Signage, variable speed signs, journey monitoring cameras all working together
Snaking through the central south
Snaking through the central south
The 11-barrell culvert and wetland, completed and looking great
Thermo plastic icing on OGPA cake
Three lanes - northbound and southbound in this section
Three rock cuts in a row
Tip site 16 in final stages of close out
Woodcocks Road bridge from above
Years of hard slog coming to fruition
January 2023
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, January 2023
Ascending to the highest point of the alignment
Beautiful vista of the Dome Valley in the background
Climb up to Moir Hill ready to go
Dreamin' in a Hydrema
Entrance to one of the many rock cuts
Intersection of Matakana Link Road nearing completion
Last of the trees being removed from the Southern Pa site
Layered rock cuts in the Central North
'Linking' pathways
Locals sunning themselves
NASRA testing of road surface
Native bush adjacent to the alignment
One of our awesome traffic controlers ready for their next assignment
One of the main Northern Connections traffic islands ready for concrete pour
One of the steeper rock cuts
Photo so good it could be framed
Pointing the way to the winterless North
Projects largest gantry sign
Puhoi you beauty!
Shaping and contouring of one of the projects largest tip sites
Shared pathway location in the Northern Connection
Tapuwae o Kahumatamomoe peaking out from behind a rock cut at the projects highe
The gentle climb to Moir Hill
The Hikuwae Stream downstream from the project
View of the alignment from SH1
Welcome to Puhoi
White lines and blue skies
December 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, December 2021 vs 2022
Beginning the ascent to Moir Hill Road
'Big Red' the projects paving machine doing its thing
CN1 rock cut ready for line marking
Completed section of the alignment looking good
Complex paving operation at Arawhiti Pua Ngahere
Example of benching at the top of the rock face
Looking back at how far we have come
Many shades of rock
Northbound crawler lane to assist traffic flow
Northern section of alignment waiting for wire rope tensioning
On the down hill south of Tapuwae o Kahumatamomoe (Moir Hill Bridge)
One of the alignment monitoring cameras
One of the steeper climbs on the alignment
Paving team smashing out the final layer of asphalt
Perry Road access track
Planted batter getting good Spring growth
Rock cuts as far as the eye can see
Sign installation has begun
Under-side of Arawhiti ki Ōkahu showing steel beam structure
Works happening on Ōkahu gantry
November 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, November 2022
Central North ready for final layer of asphalt
Chipseal crews in action
Chipseal operator
CN1 cut looking North
Completed wetland in the Central North
Completing land owner access-way
Fencers hard at work
Full steam ahead
Geotechnical assessment in the Central North
Hands on operation of the paving machine
Happy 'steak'holders
Hydro seeding in the Central North
Kauri Dieback Protocols
Looking South from the Central North
Lots happening in the Central North
N3 cut with Dome Valley hills in the background
Northern area ready for wire rope installation
Northern section of alignment all but completed
OGPA placement in the Central South
Our wonderful paving Foreman
Over height detectors ready to go
Pavement crew member with a spring in his step
Perry Road construction
Puhoi Onramp
Rock and (mesh) roll
Smiles despite the weather
The Wahine doing the mahi
They see me rollin
Thumbs up for lunch
Twin paver OGPA placement
We're all smiles on the alignment
What a beautiful site
Wire rope progression in the Central South
With summer comes the weeds
October 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, October 2022
Beautiful fencing work
Central north area looking through several rock cuts
Central north rock cut showing the layers of sedimentary rock
Central North wetland completed and batters hydroseeded
Central South area prior to final asphalt layer
Central South ready for final layer of asphalt
Close out and tidy up works at the rock borrow
CN5 rock cut - the largest on the project
CN7 cut ready for the final layer of asphalt
Completed northern section of alignment
Completed wire rope barriers
Final OGPA asphalt layer - icing on the cake
Final rock cut stabilisation works in the Central North
Finessing the slipform barriers
Finishing touches starting to appear
Fresh asphalt on Waiwera Viaduct
Geovert crew discussing rock bolt installation
Higgins paving crew ready for action
Installation of ITS on Hibiscus Coast Highway
Installation of rock bolts in CN5 cut
Looking North with Dome Valley in the distance
Mahurangi Bridge Barrier with slipform barriers to the north and south
Milling of Johnstone's Hill Tunnels
New access to private land adjacent to motorway
Newly completed accessway to private land
Northern section with final layer of asphalt, wire rope barrier and line marking
One load of many fence posts ready for installation
Our amazing planting team doing what they do best
Permanent wetland in the Central North
Removal of material from slip remediation
Shaping of material in one of the last remaining tip sites
Signage on approach to the Northern Connection
Slip form barrier machine
Slip remedial works in the Central North
Southern area immediately prior to final asphalt
Stock proof fencing stream crossing
Within touching distance
Works on slip remedial in the Central North
September 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, September 2022
Checking of surface levels during pavement construction
Completed rock lined swale adjacent to SH1 at the Northern Connection
Dig out and preparation of old section of SH1 prior to pavement work and asphalt
Improvements to existing SH1 prior to asphalting
Looking South along the alignment from Pukerito
Northern foreman Richie admiring the results of his team's hardwork
Old section of SH1 looking South towards Warkworth
Pavement density testing prior to asphalting
Pukerito from above
Pukerito roundabout open for business
Pukerito with Matakana Link Road and Warkworth in background
August 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, August 2022
Beam testing at Watson Road Bridge
Central north area with an array of finishing works taking place
Checking and signing off of ITS assets
Drilling for rock bolt installation on one of our central north rock faces
Final trimming of rock swales
Happy on the job
Higgins team having a break between verge and median chip-sealing
Independent reviewer checking ITS assets
Inspection of alignment camera
Looking south towards Arawhiti Pua Ngahere
One of our 'shy' gate ladies
Our largest embankment fill - Central North area
Placement of SIL layer soutbound lanes approach to tunnels
Preparation for final rock bolts at Tapuwae o Kahumatamomoe - Moir Hill Bridge
Preparation for installation of counterfort drains
Project borrow pit (quarry) closed out and grassed
Rock bolt installation in Central North area
Roller operator ready for asphalt delivery
Rolling of laid asphalt
Smiles in the sunshine
Southern connection with terrestrial and mitigation planting in the background
Surveying prior to construction of slipform barrier on Woodcocks Bridge
'Tiny Robot' marking out wire-rope barrier posts placement
July 2022
11 barrel culvert providing flood balancing to either side of the alignment
Close-up of median drainage and wire-rope posts
CN5 our largest rock cut with a 70m high rock face
Cycle friendly catch-pit grate
Delivery of aggregate for pavements
Drilling of holes for additional rock bolts
Final preparations prior to asphalting
Finishing works on Arawhiti Pua Ngahere
In-fill planting
Kerbing complete at the Northern Connection
Looking North West over the Southern end of the project
Looking south towards the Central North
Mist over JHT and Waiwera Valley in the background
Misty mornings in the south
One of our three completed underpasses
Our geotechnical experts assessing rock face stability
Planting on cut batter established and growing well
Posts in place ready for wire rope installation
Projects largest tip site grassed and closed-out
Pūhoi on-ramp
South of Tapuwae o Kahumatamomoe
Southbound lanes into tunnel getting up to final level
Tapuwae o Kahumatamomoe
Warkworth end of the new shared pathway
June 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, June 2022
Arawhiti ki Ōkahu in all its glory
Check out the growth of our landscape planting!
Completed median drainage in the Central North area
Completed off-alignment works in the southern area
Completed rock lined swale and culvert inlet in the Central North area
Completion of rock bolts in the central north area
Enviro Advisor Luci happy with everyone's work
H&S Advisor Lewis overseeing safety processes in the south
Installation of median drainage
New horizons from Hibiscus Coast Highway
Northbound on Arawhiti ki Ōkahu
Northern Connection traffic islands ready for concreting
Preparing the motorway verge for chip-sealing
Proud to have traffic using the southern end of the motorway
Southbound access on and off the new alignment
Southern end of the motorway in action
Supervisor Rory reflecting on a job well done
The spectacular Southern Connection
May 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, May 2022
Asphalting of Puhoi on-ramp
Autumn grass growth at the Northern Connection
Central north alignment tack coated and ready for asphalt
Central north area - last remaining area of asphalt ready for placement
Centre median works prior to sealing
CN1 rock cut with asphalt and median completed
Compaction of AP40 aggregate in the southern area
Compaction of verge using hand roller
Completed road side drainage in the northern area
Construction of shared pathway at the Northern Connection
Contouring of tip site
Delivery and placement of rock riprap
E530 culvert at Matakana Link Road near completion
Early morning in the southern section
Inlet works at the 11 barrel culvert nearing completion
Kerb and channel construction
Kerb and channeling just south of Goatley Road
Kerbing machine at the Northern Connection
Landscape planting well established in the northern area
Median drainage works in the northern area
One of our skilled grader operators taking a well earned break
Pukerito Roundabout being prepared for asphalting
Southern gantry VMS sign operational
Spreading of top soil on cut slope
Subgrade improvement works at Northern Connection
Surveying of pavement levels in the central area
Te Arawhiti ki Ōkahu just prior to asphalting
Te Arawhiti ki Ōkahu viewed from Billings Road
Te Arawhiti ki Ōkahu with final asphalt layer
Te Arawhiti ki Pūhoi with levelling layer asphalt
Te Arawhiti Pua Ngahere looking south
Tip site 15 in the central north completed
April 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, April 2022
Contouring of tip site
Eyes in the sky
Final grassing of projects largest tip site
Inspection of VMS board on southern gantry
Installation of electronics on southern gantry
Installation of VMS board on southern gantry
Installation of wire rope barrier posts
Last of the base course placement in Central North
Last of the concrete barrier installation at Arawhiti ki Ōkahu
Motorway alignment view from Hibiscus Coast Highway
Northern gantry
Projects largest tip site being closed out
Puhoi off-ramp asphalting
Puhoi on-ramp and bridge in the background
Puhoi south bound on-ramp
South bound on-ramp at Puhoi
Southern area finishing works well underway
Southern tie-in to tunnels
Southern tie-in viewed from Hibiscus Coast Highway
Surveying of Arawhiti ki Ōkahu surface
Tack coat placed on Arawhiti ki Ōkahu
March 2022
Always happy on the job
Central median being rolled and prepped
Central North rock cut looking south
CJV staff observing the spider drill operations
CN rock cut looking south towards Tapuwae o Kahumatamomoe - Moir Hill
Completed street light installation at the Northern Connection
Construction of the new Pūhoi southbound on ramp
Installation of pavement subsoil drainage
Installation of pavement subsoil drainage
Landscape maintence spraying
Landscape planting alongside the motorway enjoying autum sunshine
Last of the subgrade stabilisation work in the Central North
Looking over Central South alginment from Tapuwae o Kahumatamomoe_Moir Hill
Motorway alignment north of the JH tunnels ready for the southern traffic switch
New alignment through steep terrain
Pavement subsoil drainage installation
Preparation for asphalt paving just north of Tapuwae o Kahumatamomoe-Moir Hill
Projects largest embankment fill in the CN
Projects largest rock cut
Spider drill operator all kitted out
Spider drill undertaking slope stabilization
Spider drill undertaking slope stabilization
Spider drill undertaking slope stabilization just north of Pūhoi
Stabilization of subgrade layer just north of Pūhoi
Stabilization team working north of Arawhiti ki Pūhoi
Survey team checking levels
Wetland with established planting in the CN
Wire rope barrier installation
Wire rope barrier post installtion
February 2022
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, February 2022
Carran Road Underpass
Central North cut 7 with asphalt in placev
Checking ground levels on site
CN13 rock cut with Tapuwae o Kahumatamomoe in background
Drone spraying weeds
Earthworks team member
Foreman of the Northern Connection
Freshly sprayed tack coat Central North cut 1
Happy with progress
Measuring swale levels
Median and verges being completed at KEV
Milling machine
Milling machine in action
Operator of the milling machine
Overseeing works in the central north
Pavements Foreman on site
Planting overlooking Carran Road
Preparation of median
Proud operator in the central north
Stream diversion completed next to Mahurangi River
Swale construction
Swale construction in central south
Taking 5 on site
Testing stabilised fill prior to aggregate placement
The final section of alignment getting ready for the pavements team
The last section of alignment fill in the project being completed
January 2022
Aggregate placement prior to asphalt
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, January 2022
Asphalt in the central north, looking north
Central north area with two layers of asphalt
Drilling rig installing rock bolts
Drone image of E530 culvert at the Northern Connection
Drone image of Pūhoi on and off ramps
Drone image of Pukerito/Northern Connection
Drone image of the Southern Connection
E530 culvert at the Northern Connection
Excavator completing finishing works
Final area of earthworks being completed
Inside the E530 culvert in the north
Installing rock bolts in the central north
Milling machine
Operator onsite
Pūhoi on-ramp looking north
Remote controlled trench roller
Street lighting north of Arawhiti ki Ōkahu
Subgrade improvement layer at Tapuwae o Kahumatamomoe/Moir Hill
Surveying ITS foundation levels
The Northern Connection roundabout
Trenching for pavement subsoil drainage
December 2021
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, December 2021
Asphalt loading into shuttle buggy
Central North looking south with full pavement width (3 lanes) southbound
Central North zone rock cuts looking north
Central North. Asphalt being laid
Central South climb up to Moir Hill
Compacting aggregate on shoulder in northern area
Concrete pouring at Woodcocks Bridge looking North
Gantry at Southern Connection
Looking North from Johnstone Tunnels
Looking north towards Arawhiti ki Pūhoi
Looking north towards Arawhiti ki Pūhoi
Pavements team member
Paving machine
Paving machine operator
Paving machine operator
Sunsetting in Central South
Surveying at Tapuwae o Kahumatamomoe (the bridgeoverpass at Moir Hill)
Team working on rock slope stabilisation
Traffic management at Moir Hill
November 2021
Arawhiti ki Ōkahu (the viaduct over Ōkahu Inlet)
Arawhiti ki Ōkahu (the viaduct over Ōkahu Inlet) looking south
Asphalt delivery drivers
Central North cut 1, rock cut looking south
Central North cut 7, rock cut looking south
COVID friendly gate keeper
E530 Culvert in the north
Finishing works on Arawhiti ki Ōkahu (the viaduct over Ōkahu Inlet)
Gentle climb towards Moir Hill
Installing light poles in the south
Landscaping on the project
Looking north to central north cut 7 rock cut
Looking north towards Arawhiti ki Pūhoi
Looking South from the northern connection
Northern connection from above
Pavements team
Paving in the southern most area of the project
Power lines installed in the southern end of the project
Rock lined swale and subgrade improvement layer rock placement
Rock mesh installation
SAP9B gate staff ensuring safe entry to site
Southern connection in progress
The approaches to Mahurangi Bridge freshly paved
The mighty central north 5 rock cut
Trenching machine
Trenching machine waiting for its next assignment
October 2021
Alignment ready for asphalt in Central North
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, October 2021
Arawhiti ki Ōkahu (the viaduct over Ōkahu Inlet) looking north
Arawhiti Pua Ngahere looking south
Asphalt compaction
Central North preparing for the pavement process
Central North, looking north
Curb and channeling
Drone shot of the Pukerito/Northern Connection
Finishing works on the viaduct
GAP65 placement for subgrades
Masked up
Milling of rock cut
Newly laid asphalt in the Central South
Northern connection aerial photograph
Paving machine
Permanent wetland for treating motorway water run off
Rock bolting in Central North
Subgrade improvement layer prior to asphalt
Tapuwae o Kahumatamomoe (the bridgeoverpass at Moir Hill)
The Pavements team in action
Undertaking level checks on curbing
September 2021
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, September 2021
July 2021
11 Barrel Culvert
Abseilers installing biodegradable jute matting
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, July 2021
Barriers installed Arawhiti Pua Ngahere
Barriers up at Arawhiti Pua Ngahere
Gatekeeper Rachel in the South
Happy out on site
Looking north onto SH1 at the Northern Connection
Planting established at wetland pond in the north
Pūhoi on and off ramps from above
Pukerito (Northern Connection) from above
Securing batters at the southern end of Arawhitki Pūhoi
Some of our engineers on site
Southern connection team
Southern end of Arawhiti ki Pūhoi looking South
Surveying
Woodcocks Road Bridge
June 2021
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, June 2021
Arawhiti Pua Ngahere barrier install
Barrier install Arawhiti Pua Ngahere
Barrier install Arawhiti Pua Ngahere
Central north 1 rock cut midway
Central north rock cut 1
CN4 fill
CN4 fill & CN1 rock cut
CN4 looking south
CN4 rock cut looking north
CN5 rock cut
CN5 rock cut looking south
CN8A fill & CN5 cut
CN8A fill stabilised
CN9 with AP40
Highway Stabilisers in action
Looking down on Arawhiti Pua Ngahere
Maui. Foreman of Alignment and Finishing Works
Perry Road stormwater pond
Rock drapery placement
Some of the Wyllie Road office staff out with the safety team
Tapuwae o Kahumatamomoe (the bridgeoverpass at Moir Hill) from above
Tapuwae o Kahumatamomoe (the bridgeoverpass at Moir Hill) taking shape
Trenching in CN7 rock cut
Trenching in CN7 south
Trenching works
Woodcocks Road nightworks
May 2021
AM & M Building situated at the northern connection
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, May 2021
Arawhiti ki Ōkahu (the viaduct over Ōkahu Inlet) looking south
Arawhiti ki Pūhoi (the viaduct over Pūhoi River) looking north
Arawhiti ki Pūhoi (the viaduct over Pūhoi River) looking north
Drone shot of Arawhiti ki Ōkahu looking south to the Johnstones tunnels
Drone survey
Environmental team out and about
From the drivers seat of the paver machine
Geovert team members doing what they do best
Happy (and sunny) days
Health and Safety Team
Landscaping underway in central south
Looking north towards Arawhiti ki Pūhoi (the viaduct over Pūhoi River)
Northern connection and the existing SH1
One of our digital engineers on the project
One of our lovely gate keepers
Operator working in the northern zone
Out and about getting drone photos
Panoramic view of Arawhiti Pua Ngahere (the viaduct which passes through a Kauri
Pavement machine in the northern area
Pavements in progress
Planting at wetlands in the south
Safety first!
Stopping for a quick wave
Taking five from the rain
Team in Pūhoi
The northern connection from above
The team in Pūhoi
The team working on Arawhiti Pua Ngahere (the viaduct which passes through a Kau
Works at Mahurangi Bridge
April 2021
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, April 2021
A couple of awesome engineers
An impressive cut in the central north
Arawhiti ki Pūhoi (the viaduct over Pūhoi River) beside State Highway 1
Awesome operators
Big smiles from a cool operator
CB Civil team at work on the Pūhoi on ramp
CB Civil team at work on the Pūhoi on ramp
CB Civil team at work on the Pūhoi on ramp
CB Civil team at work on the Pūhoi on ramp
Central north views
Central south of the project
Cuts and fills in the Central North
Environmental controls at work
Geovert crew
Keeping an eye on the traffic at the Southern Connection
Lola the Leading Hand and Rupert, Landscaping Foreman
Rock mesh
Rock mesh installation
Rock mesh installation
Rupert, Zen and Lewis at the Southern Connection
Stabilisation work in the north
Tapuwae o Kahumatamomoe (the bridge/overpass at Moir Hill)
The Pūhoi on ramp under construction
March 2021
A stunning view in the Central North
Alignment above Watson Road Bridge
All of the beams now in place on Woodcocks Road Bridge
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, March 2021
Arawhiti ki Ōkahu and Ōkahu Inlet
Awesome team working on drain construction
Central North rock cut
Checking the enviro controls at Moir Hill
CS16D cut at the northern end of Arawhiti ki Pūhoi
Driving on Arawhiti ki Pūhoi
Earthworks at Pūhoi
Earthworks underway at the Southern Connection
Environmental and Quality teams inspecting works
Hydroseeded batters
Looking north along Arawhiti ki Ōkahu and the new alignment
Mahurangi River Bridge
Pūhoi on-ramp under construction
Rock cut
Southern Connection
Southern Connection earthworks team
Surveying the viaducts
Tapuwae o Kahumatamomoe
Tapuwae o Kahumatamomoe, the bridge at Moir Hill
The alignment near Pūhoi
The first asphalt laid on the motorway
Vermeer machinery at work
Woodcocks Road Bridge from above
February 2021
11 Barrel Culvert
11 Barrel Culvert now with subgrade placed
Alignment in North with bitumen tac coat
Arawhiti ki Ōkahu in progress
Arawhiti ki Ōkahu looking North
Arawhiti ki Ōkahu looking South from below
Arawhiti ki Pūhoi and SH1 looking South
Arawhiti Pua Ngahere
Central North 4 eastern batter ready for mulch. Twin sediment pond in foreground
Central North 4 fill
Central North 7 rock cut
Central North cut 1 looking South and Perry Road access road under construction
Environment Team hard at work
Geotechnical team evaluating a cut slope
Important planning on the job
Longitudinal drainage installation in Central North
Looking north to Central North cut 5
Looking South down the alignment
Pavement machine being assembled
Perry wetland under construction
Project Flyover, February 2021
Shuttle Buggy ready for pavement action
Tapuwae o Kahumatamomoe (Moir Hill Bridge)
Team working under Arawhiti ki Ōkahu
Tidy fencing going up
Woodcocks Road Bridge under construction
January 2021
Arawhiti ki Ōkahu from below
Arawhiti ki Ōkahu progress looking North
Central North cut 1 looking North
Central North cut 1 rock bolt installation and topsoil placement
Completed farm access and batter stabilization
Farm access underpass
Installation of drapery mesh
Installing Super T's at Arawhiti Pua Ngahere
Longitudinal drainage at Tapuwae o Kahumatamomoe
Longitudinal drainage installation
More stabilizing on the alignment
Pavements team taking five
South western stabilization works Central North cut 1
Stabilizing subgrade improvement layer
Trenching machine
Trenching machine in action
Trimming of rock batters
December 2020
A hint of the new alignment (CN4 fill)
Arawhiti ki Ōkahu deck
Arawhiti ki Pūhoi and State Highway 1
Barrier wall installation on Arawhiti ki Pūhoi
Beams installed on Arawhiti pua Ngahere
Central North cut 5
Earthworks in the central north
Earthworks underway in the central north
Mulching near Arawhiti ki Ōkahu
On top of Arawhiti ki Pūhoi
One of our awesome gatekeepers
Part of the new alignment
Planting and fencing in the central north
Project Flyover, December 2020
Rock mesh installation at CN5
Rock mesh installation at CN9
Tapuwae o Kahumatamomoe (Moir Hill Bridge)
Texas handrails installed on Arawhiti ki Ōkahu
November 2020
Compactor operator for the Earthworks team
Earthworks season in full force
Earthworks underway just North of Moir Hill Bridge
Lime stabilisation
Lime stabilisation South of Woodcocks Road
Mahurangi Bridge
Mahurangi bridge looking South
Moir Hill Bridge
Mulch placed and ready for planting
Mulching near Woodcocks Bridge
Project Flyover, November 2020
Rock batter milling
Rock face stabilisation works in the South
Sediment retention pond being decommissioned to make way for Pūhoi on ramp
Smiles on the job
Some of our awesome operators from the Earthworks team
Southern labor crew
Spreading top soil in the South
Structures team at Arawhiti ki Ōkahu
Sub grade improvement layer ready for asphalt in the South
Team on the job
The big kit
Up close and personal with the motorscraper
October 2020
11 barrel culvert
A hydroseeded MSE wall beside SH1
All deck panels installed on Arawhiti ki Pūhoi
Big kit lined up
Big machines at work in our final bulk earthmoving season
CN5 cut
CN7 cut and CN10 fill
CN7 cut with CN9 cut behind
Earthworks underway in the Central South
Looking out over the Central North
On-site quarry
Piling at Woodcocks Rd Bridge
Project Flyover, October 2020
Side panels being installed on Arawhiti ki Ōkahu
Side panels waiting to be installed on the deck of Arawhiti ki Ōkahu
Staff on the completed concrete deck of Arawhiti ki Ōkahu
Watson Bridge
Widening work underway on Hibiscus Coast Highway at the Southern Connection
Working in front of Tapuwae o Kahumatamomoe
September 2020
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, September 2020
Arawhiti Pua Ngahere
Articulated dump truck (ADT) carrying waste material to tip site
Big machines back on the job at CN13
Cut to waste material at CN5
Delivery of aggregate at Arawhiti ki Pūhoi
Earthworks near Tapuwae o Kahumatamomoe
Earthworks season underway
Eleven barrel culvert
Emulsion applied to SIL in Central South
Finished grass batter and permanent stream diversion
ITS trenching
Looking north over Arawhiti ki Ōkahu
Looking north over Arawhiti ki Pūhoi
Measuring ground level
Mulching underway
One of our largest excavators
Rock bolt installation at CS3
Stockpiled aggregate ready for placement
Topsoiled batter and rock lined swale
Trenching and ITS installation at CS16D
Trimming the batter at CN5
Working in the Central South
August 2020
11 Barrel Culvert drone shot
Arawhiti ki Ōkahu
Arawhiti ki Ōkahu deck progress
Arawhiti Pua Ngahere
Big cuts at CN1
Catching up with mates
Central North 7
Central North cut 5
Central North cuts
Central North rock cut
Central South
Central Zone access road
Landscaping
Landscaping overlooking SH1
Milling the rock face
Project Flyover, August 2020
Rigid delivering rock to the crusher
Rigids back on the job
South 4 cut looking South
Structures Team
Structures team at work
Surveying
The Wiki Cousins
Watson Road Bridge from above
Woodcocks Road Bridge
Works at 11 Barrel Culvert
July 2020
11 Barrel Culvert
Arawhiti ki Ōkahu deck progress
Arawhiti ki Ōkahu from below
Arawhiti ki Ōkahu looking North
Arawhiti ki Pūhoi looking North
Arawhiti ki Pūhoi looking North
Arawhiti Pua Ngahere
Borrow Pit
Bulldozer moving rocks under Tapuwae o Kahumatamomoe
Central South
Deck progress on Arawhiti ki Ōkahu
Mahurangi River Bridge
Northern Connection
Reco Walls Abutment Mahurangi River Bridge
Structures Team working on Arawhiti ki Ōkahu
Sub Grade Improvement Layer - North
Team keeping dry at the Northern Connection
Watson Road Bridge Beam Installation
June 2020
11 Barrel Culvert
11 Barrel Culvert
11 Barrel Culvert
Arawhiti ki Ōkahu (Ōkahu Viaduct)
Arawhiti ki Ōkahu (Ōkahu Viaduct)
Arawhiti ki Ōkahu (Ōkahu Viaduct)
Arawhiti ki Pūhoi (Pūhoi Viaduct)
Central north
Girder lift, Arawhiti ki Pūhoi (Pūhoi Viaduct)
Looking north towards Arawhiti ki Pūhoi (Pūhoi Viaduct)
Northern zone
Road surface testing
Rock cut - Southern zone
Southern zone
Tapuwae o Kahumatamomoe (Moir Hill Bridge)
Transportation of kit in Pūhoi
Watson Rd Bridge
Wetlands, northern zone
Project flyover, June 2020
May 2020
Arawhiti Pua Ngahere - Kauri Eco Viaduct
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Northern Zone
Central Southern Zone
Central Southern Zone
Central Southern Zone
Central Southern Zone
CN1 Cut
CN1 Cut
CN1 Cut
Mahurangi Bridge
Mahurangi Bridge
Mahurangi Bridge
Mahurangi Bridge
Mahurangi Bridge
Northern Connection
Northern Connection
Northern Connection
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone - 11 Barrel Culvert
Northern Zone - 11 Barrel Culvert
Northern Zone - 11 Barrel Culvert
Northern Zone - Pavement works
Northern Zone - Pavements
Northern Zone - Pavements
Northern Zone - Wetland
Northern Zone - Wetland construction
Tapuwae o Kahumatamomoe - Moir Hill Road Bridge/Overpass
Tapuwae o Kahumatamomoe - Moir Hill Road Bridge/Overpass
Tapuwae o Kahumatamomoe - Moir Hill Road Bridge/Overpass
April 2020
Arawhiti ki Ōkahu – Ōkahu Viaduct - Southern Connection
Arawhiti ki Ōkahu – Ōkahu Viaduct - Southern Connection
Arawhiti ki Ōkahu – Ōkahu Viaduct - Southern Connection
Arawhiti Pua Ngahere - Kauri Eco Viaduct
Arawhiti Pua Ngahere - Kauri Eco Viaduct
Arawhiti Pua Ngahere - Kauri Eco Viaduct
Arawhiti Pua Ngahere - Kauri Eco Viaduct, Piling works underway
Central North
Central North
Central North
Central North
Central North - Three barrel culvert and fill
Central North alignment and cut
Central North cut
Central North cut
Central North cut
Central North cut
Central Southern Zone
Central Southern Zone
Central Southern Zone
Central Southern Zone
Central Southern Zone
Central Southern Zone
Central Southern Zone
Mahurangi River Bridge
Mahurangi River Bridge
Mahurangi River Bridge
Mahurangi River Bridge structural work
Northern Zone
Northern Zone - 11 Barrel Culvert
Northern Zone - 11 Barrel Culvert
Northern Zone - Woodcocks Road Bridge
Northern Zone culvert
Southern Zone - Hikauae Underpass
Tapuwae o Kahumatamomoe - Moir Hill Bridge/Overpass
Tapuwae o Kahumatamomoe - Moir Hill Bridge/Overpass
Project Flyover: April, 2020
March 2020
Arawhiti ki Ōkahu – Ōkahu Viaduct
Arawhiti ki Ōkahu – Ōkahu Viaduct - Southern Connection
Arawhiti ki Ōkahu – Ōkahu Viaduct - Southern Connection
Arawhiti ki Pūhoi – Pūhoi Viaduct
Arawhiti ki Pūhoi – Pūhoi Viaduct
Arawhiti ki Pūhoi – Pūhoi Viaduct Girder delivery
Arawhiti Pua Ngahere - Kauri Eco Viaduct
Central North
Central North Cut
Central South
Earthworks
Four barrel culvert - Southern Zone
Hikauae Underpass - Southern Zone
Mahurangi Bridge
Moir Hill Bridge/Overpass - Tapuwae o Kahumatamomoe
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone
Northern Zone - Wyllie Road new alignment
Northern Zone Cut
Southern Zone
February 2020
Project Flyover, February 2020
Abutments - Watson Road - Site Access Point 7
Arawhiti ki Ōkahu (Ōkahu Viaduct)
Civil works at Site Access Point 12
Enabling works Pukerito
New Wyllie Road
Preparation for Arawhiti Pua Ngahere (Kauri Eco Viaduct)
Tapuwae o Kahumatamomoe (Moir Hill bridge
View from Arawhiti ki Ōkahu (Ōkahu Viaduct)
November 2019
Ara Tūhono – Pūhoi to Warkworth: Earthworks Season 2019/20
October 2019
September 2019
Arawhiti ki Ōkahu - DMMC CC2800 crawler crane
Central Cut
Plant
Surveyors
Tapuwae o Kahumatamomoe
Tapuwae o Kahumatamomoe
View from Tapuwae o Kahumatamomoe
August 2019
Earthworks - Northern Zone
Earthworks - Northern Zone
Earthworks - Southern Zone
Mahurangi Bridge
Rock Cut - Central North Zone
Tapuwae o Kahumatamomoe
View of the alignment
View south from Tapuwae o Kahumatamomoe
July 2019
Arawhiti ki Ōkahu
Arawhiti ki Ōkahu - Headstock
Earthworks - Southern Zone
Earthworks - Southern Zone
Mahurangi Bridge
Mahurangi stream diversion
Moir Hill Road realignment
S1 Cut
June 2019
Ara Tūhono – Pūhoi to Warkworth: Project Flyover, June 2019
Tapuwae o Kahumatamomoe
Tapuwae o Kahumatamomoe
Tapuwae o Kahumatamomoe
Tapuwae o Kahumatamomoe
Te Arawhiti ki Ōkahu
Te Arawhiti ki Ōkahu
Te Arawhiti ki Ōkahu
Te Arawhiti ki Pūhoi
May 2019
Ara Tūhono – Pūhoi to Warkworth
Ara Tūhono – Pūhoi to Warkworth
Ara Tūhono – Pūhoi to Warkworth
Tapuwae o Kahumatamomoe
Te Arawhiti ki Ōkahu
Te Arawhiti ki Ōkahu
Te Arawhiti ki Ōkahu
Te Arawhiti ki Ōkahu
April 2019
Borrow Pit
CN1
CN4
CN5 4
CN5 Cut
CS8B Box culvert CS8C Fill
CS8D Cut
CS8E Fill
Earthworks opertaions forming the new Wyllie Road looking North
Hay Bales next to N1A Cut
Looking North over CN4 and CN1
N3E Cut looking south
N4A Fill_Mahurangi Bridge South abutment
Northern Connextion cut to Fill at Roundabout
S1 Cut
S1 Cut
S4B Cut
Standing on N3A Fill looking North at the rock blast at N3C Cut
March 2019
March 2019 Drone Footage
Arawhiti ki Ōkahu
CN4
CN8A Culvert
CN9
Mahurangi Bridge South Abutment
Perry Road Underpass
S2 Fill
View of CN1
February 2019
Central Cut
Central Zone
CS1 Cut
Moxy on the move!
Okahu
Puhoi North Cut
Woodcocks - Drone View
Woodcocks Crossing
January 2019
Pūhoi to Warkworth Motorway Project - Comparison Video December 2018/July 2017
Arawhiti ki Okahu view south
Bridge column under construction - Okahu
Column framework - Okahu
Culvert Installation - Central South
Fill - Central South
Northern Area - Earthmoving
Water Cart
December 2018
December Drone Footage
Earthworks Season 2018/19
November 2018
CN1 - Cut
Culvert Installation - CN4
Northern Zone
Woodcocks Road & Carran Road Realignment
October 2018
120 tonne excavator
120 tonne excavator
60 tonne dump trucks
Central North Zone
Culvert installation, central north area (CN4)
Earth moving equipment, Hydrema
Earthworks, central north area
Piling works at Te Arawhiti ki Ōkahu
Piling works at Te Arawhiti ki Ōkahu
Te Arawhiti ki Ōkahu
View north towards CN1 cut, central north area
View towards Ōkahu inlet, location of Te Arawhiti ki Ōkahu (Ōkahu viaduct)
September 2018
Project flyover North to South, September 2018
Abutment works underway for Te Tapuwae o Kahumatamoemoe (Moir Hill Overpass)
Abutment works underway for Te Tapuwae o Kahumatamoemoe (Moir Hill Overpass)
Central North structure
CN1 cut & blast area, view south
CN4 culvert installation
CN8 culvert installation
CS2F cut, view north, south of Moir Hill Road
CS8 cut, filling and compacting
Ground improvement works, Te Arawhiti Pua Ngahere (Kauri Eco Viaduct)